IAP GITLAB

Skip to content
Snippets Groups Projects

Adapt condition in `SwitchProcessSequence` similar to !507

Merged Jean-Marco Alameddine requested to merge fix_switchprocesssequence into master

This MR adapts SwitchProcessSequence similar to MR !507 (merged).

I encountered the problem that my very-high-energy EM showers (1e11 GeV) failed because SIBYLL got called with an electron as a projectile, which was exactly due to the zero-cross section case described in MR !507 (merged)

Merge request reports

Merge request pipeline #10819 passed

Merge request pipeline passed for c0c502c3

Test coverage 95.40% (0.00%) from 1 job

Merged by Maximilian ReininghausMaximilian Reininghaus 1 year ago (May 25, 2023 11:52am UTC)

Loading

Pipeline #10820 passed with warnings

Pipeline passed with warnings for 5652db26 on master

Test coverage 95.40% (0.00%) from 1 job

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading